EVCMC (Electric Vehicle Charging Management Controller)

EVCMC

A wave of popularity of Electric Vehicles is coming faster than anticipated, thanks to innovation, cost reductions, government support, and financial viability. Consequently, building owners and condominium boards are facing difficult choices because building new or expanding electrical infrastructure will be expensive and will take time. Therefore, Intellimeter has designed the new i-meter EVCMC which is rapidly becoming the preferred EVEMS (EV Energy Management System) as it eliminates the costly requirement to modify the existing infrastructure.

The EVCMC protects the existing infrastructure from overloads, and avoids excessive demand charges. It is available in various configurations to ensure compatibility with any buildings’ existing infrastructure.

Product Sheet

User Manual

Request a Quote

Benefits:

  • Meter and bill for the electricity used in each charger, including time of use rates.
  • Ensure the contracted demand is never exceeded by monitoring the main service demand.
  • Avoid tripping the main breaker due to overload by alternating the loads to ensure that the maximum ampacity of the feeder is never exceeded.
  • Ensure that all vehicles receive an adequate charge overnight.

This system ensures protection of the existing infrastructure, by alternating and distributing the power to multiple chargers. As a car is plugged into the charger and begins its charge, the i-meter EVCMC tracks the time it has been on. As more cars are plugged in, the i-meter EVCMC monitors the total charge to ensure that the contracted demand or the ampacity of the feeder and breaker is never exceeded by disconnecting car chargers gradually, based on the time they have been on. As the load diminishes, the car chargers are automatically connected again.

Details and Pricing

  • An Electrical Distribution Panel (three phase standard- single-phase optional)
  • Surface mount type panel, with door and lock
  • Rated 125 Amperes 120/ 208 Volts 60Hz mains - Fitted with 12 single poles
  • one of 15Amp three pole breaker (rated 10KA IC) for voltage reference for the meter
  • one of 15Amp one pole breaker (rated 10KA IC) for the controls and power supplies.
  • Current Transformer on brackets including plug terminals for wiring the Current transformers to the i-meter 636. for Four of two phase meters and One Main three phase meter.
  • One of i-meter636 Meter Display Module (MDU)

A secondary NEMA 1 rated panel to include.

  • One of i-meter-636 Measurement Canada Approved meter with SE-02 seal
  • A Data Collection Unit (Computer with i-meter-Data Basic)
  • Control software
  • 4 of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position)
  • Four sets of LV relay Control Boards.
  • Prewired and fully labeled.
  • Set of Engineering drawings for Approval
  • Electrical Safety Authority Inspection and approval (according to Jurisdiction)

Intellimeter’s EVCMC-4 includes the Distribution panel with breakers (Means of Disconnection and Short Circuit Protection), a demand controller, a Measurement Canada approved and sealed meter for every charger and software for remote access for billing. The Intellimeter consumption data base can be accessed by any third-party billing company.

Lead time 10 to 12 weeks after order confirmation and drawing approval if required.


Witness testing on our facility is available, Shipping and Taxes are extra.


DRAWING for EVCMC-4

  • An Electrical Distribution Panel (three phase standard- single-phase optional)
  • Surface mount type panel, with door and lock
  • Eight (8) of two poles 40 Amp. breakers (rated 10KA IC)
  • One of 15Amp three pole breaker (rated 10KA IC) for voltage reference for the meter
  • One of 15Amp one pole breaker (rated 10KA IC) for the controls and power supplies.
  • Two sets of Current Transformer rails (or brackets) including transition terminals for wiring the Current transformers to flat ribbon cables to feed to the i-45meter. With Eight of two phase meters and One Main three phase meter.
  • One of i-meter-45 Meter Display Module (MDU)

A NEMA 1 rated panel to include:

  • One of i-meter-45 Revenue Grade Approved meter with seal if required
  • A Data Collection Unit (Computer with i-meter-Data Basic)
  • Control software
  • Eight (8) of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position)
  • Four sets of LV relay Control Boards.
  • Prewired and fully labeled.
  • Set of Engineering drawings for Approval
  • Electrical Safety Authority Inspection and approval (according to Jurisdiction)

Intellimeter’s EVCMC-8 includes the Distribution panel with breakers (Means of Disconnection and Short Circuit Protection), a demand controller, a revenue class approved and sealed meter for every charger and software for remote access for billing. The Intellimeter consumption data base can be accessed by any third-party billing company.

Lead time 10 weeks after order confirmation and drawing approval if required. Witness testing on our facility is available, Shipping and Taxes are extra.

DRAWING for EVCMC-8

  • An Electrical Distribution Panel (three phase standard- single-phase optional)
  • Surface mount type panel, with door and lock
  • Rated 225 Amperes 120/ 208 Volts 60Hz mains - Fitted with 30 poles.
  • 12 of two poles 40 Amp. breakers (rated 10KA IC)
  • One of 15Amp three pole breaker (rated 10KA IC) for voltage reference for the meter
  • One of 15Amp one pole breaker (rated 10KA IC) for the controls and power supplies.
  • Two sets of Current Transformer rails (or brackets) including transition terminals for wiring the Current transformers to flat ribbon cables to feed to the i-45meter. With Twelve of two phase meters and One Main three phase meter.
  • One of i-meter45 Meter Display Module (MDU)

A NEMA 1 rated panel to include:

  • One of i-meter45 Revenue Grade Approved meter with seal if required.
  • A Data Collection Unit (Computer with i-meter-Data Basic)
  • Control software
  • 12 of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position)
  • Four sets of LV relay Control Boards.
  • Prewired and fully labeled.
  • Set of Engineering drawings for Approval
  • Electrical Safety Authority Inspection and approval (according to Jurisdiction)

Intellimeter’s EVCMC-12 includes the Distribution panel with breakers (Means of Disconnection and Short Circuit Protection), a demand controller, a revenue class approved and sealed meter for every charger and software for remote access for billing. The Intellimeter consumption data base can be accessed by any third-party billing company.

Lead time 10 weeks after order confirmation and drawing approval if required. Witness testing on our facility is available, Shipping and Taxes are extra.

DRAWING for EVCMC-12

  • An Electrical Distribution Panel (three phase standard- single-phase optional)
  • Surface mount type panel, with door and lock
  • Rated 225 Amperes 120/ 208 Volts 60Hz mains - Fitted with 42 poles.
  • 18 of two poles 40 Amp. breakers (rated 10KA IC)
  • One of 15Amp three pole breaker (rated 10KA IC) for voltage reference for the meter
  • One of 15Amp one pole breaker (rated 10KA IC) for the controls and power supplies.
  • Two sets of Current Transformer rails (or brackets) including transition terminals for wiring the Current transformers to flat ribbon cables to feed to the i-45meter. With Eighteen of two phase meters and One Main three phase meter.
  • One of i-meter45 Meter Display Module (MDU)

A NEMA 1 rated panel to include:

  • One of i-meter45 Revenue Grade Approved meter with seal if required.
  • A Data Collection Unit (Computer with i-meter-Data Basic)
  • Control software

Two secondary NEMA 1 rated panels to include:

  • Six (6) of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position) In panel A
  • 12 of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position) in panel B
  • Eight sets of LV relay Control Boards.
  • Prewired and fully labeled
  • Set of Engineering drawings for Approval
  • Electrical Safety Authority Inspection and approval (according to Jurisdiction)

Intellimeter’s EVCMC-18 includes the Distribution panel with breakers (Means of Disconnection and Short Circuit Protection), a demand controller, a revenue class approved and sealed meter for every charger and software for remote access for billing. The Intellimeter consumption data base can be accessed by any third-party billing company.

Lead time 10 weeks after order confirmation and drawing approval if required. Witness testing on our facility is available, Shipping and Taxes are extra.

DRAWING for EVCMC-18

  • An Electrical Distribution Panel (three phase standard- single-phase optional)
  • Surface mount type panel, with door and lock
  • Rated 600 Amperes 120/ 208 Volts 60Hz mains - Fitted with 54 poles.
  • 24 of two poles 40 Amp. breakers (rated 10KA IC)
  • One of 15Amp three pole breaker (rated 10KA IC) for voltage reference for the meter and controls
  • One of 15Amp one pole breaker (rated 10KA IC) for the controls and power supplies.
  • Four sets of Current Transformer rails (or brackets) including transition terminals for wiring the Current transformers to flat ribbon cables to feed to the i-45meter. With Twenty-Four of two phase meters and One Main three phase meter.
  • Two of i-meter45 Meter Display Module (MDU).

A NEMA 1 rated panel to include:

  • Two of i-meter45 Revenue Grade Approved meter with seal if required.
  • A Data Collection Unit (Computer with i-meter-Data Basic)
  • Control software

Two secondary NEMA 1 rated panels to include:

  • 12 of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position) In panel A
  • 12 of two pole 40 Amp mechanically latched relays (to hold the ON or OFF Position) in panel B
  • Eight sets of LV relay Control Boards.
  • Prewired and fully labeled.
  • Set of Engineering drawings for Approval
  • Electrical Safety Authority Inspection and approval (according to Jurisdiction)

Intellimeter’s EVCMC-24 includes the Distribution panel with breakers (Means of Disconnection and Short Circuit Protection), a demand controller, a revenue class approved and sealed meter for every charger and software for remote access for billing. The Intellimeter consumption data base can be accessed by any third-party billing company.

Lead time 10 weeks after order confirmation and drawing approval if required. Witness testing on our facility is available, Shipping and Taxes are extra.